Concrete stairs are built twice: once in forms, then in concrete. Most of the work is in the forms.

Old steps out

Old concrete steps are broken out and hauled off, and the ground is prepared.

Layout

The total rise and run are measured and divided into equal steps. Landings and cheek walls are laid out.

Forms

Side forms and riser boards are set and braced. They have to be strong enough to hold wet concrete without moving.

Steel

Reinforcement is placed inside the forms, and any sleeves for handrail posts are set.

The pour and finish

Concrete is placed and finished, and the surface matched to the adjoining flatwork.

What to look at on your own steps

If you are replacing old steps, look closely at what went wrong with them. Steps that have pulled away from the house, tipped forward or sunk at one end usually sat on ground that moved. Treads that hold puddles were set without enough fall. Risers that vary from one step to the next make people trip, and that is one of the most common complaints about old stairs. Noticing these things tells you what the new stairs need to correct.

Look at where the stairs start and end. The top usually meets a door, porch or deck, and the bottom lands on a walk, patio, drive or lawn. Measure roughly how high the top is above the bottom, and think about whether a landing would help, especially outside a door that swings outward. Note any rail you want, on one side or both, so the sleeves for the posts can be planned before the pour.

Plain explanations of the terms

Rise is the height of each step, and total rise is the height of the whole stair. Run, or going, is the depth of each tread from front to back. A riser is the vertical face of a step; a riser board is the form board that shapes it. A tread is the part you stand on. Cheek walls are the side walls that hold the stair together and give a finished edge. A landing is a flat area at the top, bottom or partway along. Sleeves are short tubes set in the concrete so handrail posts can be fixed in later.

Why forming takes the most care

Wet concrete is heavy and it pushes outward hard. If a form shifts even slightly during the pour, the steps end up uneven or the cheek walls bulge. That is why forms are braced against the ground and against each other, and why riser boards are fixed so each step matches the others. Getting every riser the same height is what makes a stair comfortable and safe, because people expect each step to feel like the last one.

Trade-offs and choices

Wider treads and lower risers make a gentler stair that is easier on knees, but they take more length. Steeper stairs fit a tight space but feel harder to climb. A stair with cheek walls looks more finished and holds its edges well; open sides may suit a low stair into a lawn. A landing adds work and concrete but gives a safer place to open a door. These choices are worked out at layout, before any forms go up.

The stairs page, the matching post and the cost guide are good next reads.

See our Concrete Stairs page for how we plan and build poured steps.

Common questions

Why must every step be the same height?

People set their stride by the first step or two. A riser that is higher or lower than the others is easy to trip on, so the total rise is divided evenly.

Can handrails be added after the stairs are poured?

Rails go in most cleanly when sleeves for the posts are set in the forms before the pour, so it is best to decide on rails during planning.

Why are the forms braced so heavily?

Wet concrete is heavy and pushes outward on every board. Bracing keeps the forms from moving during the pour, so the risers stay even and the cheek walls stay straight.

Can new stairs be poured against an existing walk?

Yes. The bottom step is set to land on the walk cleanly, with a joint between them. Our post on matching steps to the patio or walk explains what can and cannot match.

Ready to talk about your project? Request a free estimate.

New broom-finish driveway in front of a three-car garage

Get your free estimate

  1. 1You send the form.
  2. 2We get in touch.
  3. 3We come and look at the job.
  4. 4You get it in writing.
  5. 5You decide.

Hours

  • Monday–Friday, 7 a.m.–7 p.m.
  • Saturday, 7 a.m.–3 p.m.
  • Closed Sunday

Based in

Orting, WA

Request Your Free Estimate

No pressure, and no obligation. We come and look at the job before we give you a number.

Call (253) 271-4640Free Estimate