This page has no prices on it, on purpose. A concrete number given without seeing the job is a guess, and guesses are where most of the trouble on concrete jobs starts. What we can do is explain exactly what moves the price, so the number on your free estimate makes sense when you see it.

Freshly poured pads beside finished ones

What moves the price

01

The size of the pour

More area means more concrete, more forming and more finishing. Shape matters as much as area: a simple rectangle is less work than curves and corners.

02

Thickness and reinforcement

A drive that carries a truck needs more than a patio that carries a table. Thicker slabs and more steel cost more, and they are often the right call.

03

Old concrete to break out

If there is a slab there now, it has to be broken out, loaded and hauled off. Steel in the old slab makes that slower.

04

Access

If the truck can back up to the forms, concrete goes straight in. If it cannot, it is wheeled or pumped, and that changes the job.

05

Slope and dirt

How much ground has to be cut, filled or hauled away to get the base where it needs to be.

06

What the ground is

Rock, clay, old fill, or something soft and wet that has to be dug out and replaced before anything is poured.

07

Drainage

What has to be done so water leaves the slab and does not end up against the house.

08

The finish

A broom finish is the plain option. Stamped and topcast finishes take more work and more material at the time of the pour.

09

Forming and edges

Steps, curves, thickened edges and tie-ins to existing concrete all take forming time.

10

Distance from Orting

Towns farther out mean more travel for people, equipment and trucks.

Why two quotes for the same job come back so far apart

Two numbers for the same driveway are usually not describing the same driveway. One might assume a thinner slab with no steel; another might be thicker and reinforced. One might include proper base preparation and compaction; another might pour straight onto what is there. One might include breaking out and hauling off the old concrete; another might leave that out. Finishes differ too. Until the scope is written down, the two numbers cannot be compared.

What a written estimate should describe

The work area and its shape, the thickness, the reinforcement, the base preparation, the finish you chose, how the slab drains, and what happens to any old concrete. If an estimate does not tell you those things, ask. Ours describes them before anything starts.

How to pay

We accept check and cash.

New broom-finish driveway in front of a three-car garage

Get your free estimate

  1. 1You send the form.
  2. 2We get in touch.
  3. 3We come and look at the job.
  4. 4You get it in writing.
  5. 5You decide.

Hours

  • Monday–Friday, 7 a.m.–7 p.m.
  • Saturday, 7 a.m.–3 p.m.
  • Closed Sunday

Based in

Orting, WA

Request Your Free Estimate

No pressure, and no obligation. We come and look at the job before we give you a number.

Call (253) 271-4640Free Estimate