Truck Access: Getting Concrete Where It Has to Go Without Tearing Up the Yard

Concrete arrives in a heavy truck. How close that truck can get shapes the pour day.

Width and height

Gates, fences, overhanging branches and overhead lines all matter.

Weight

A loaded truck can damage soft lawn, septic systems and thin paving.

When it cannot reach

Concrete is wheeled or pumped to the forms instead.

Protecting the yard

We agree the route in at the estimate and point out what to protect.

Septic

Never drive over septic tanks or drain fields. Mark them. The utilities post, the planning guide and the cost guide cover more.

What to look at on your own property

Stand at the street and picture a large, heavy truck backing toward the spot where the concrete will go. Walk the route it would take. Note the width of any gate, the gap between the house and a fence, and the space between parked cars, trees and corners of buildings. Look up as well as across: low branches, eaves, gutters, power and phone lines, and lighting can all be in the way of a truck or its chute.

Then look down. Note what the route crosses: an existing drive, a lawn, a garden bed, a gravel strip or a soft shoulder by the road. In Pierce and King County, lawns and side yards often stay soft through the wet months, and ground that holds a person may not hold a loaded truck. Note any slope along the route, since a truck on a slope is harder to place and soft ground on a slope is easier to rut. Finally, think about what is buried along the way, such as septic parts, irrigation, water lines and buried wiring.

Plain explanations of the terms

A ready-mix truck is the truck with the turning drum that brings concrete already mixed. The chute is the trough at the back that carries concrete from the drum to the forms; it reaches only a short way. Wheeling means moving concrete from the truck to the forms in wheelbarrows or powered buggies. Pumping means sending concrete through a hose from a pump truck parked where it can reach, so the ready-mix truck does not have to get close. The pour is the placing of the concrete into the forms. The forms are the boards that hold the concrete to shape until it sets.

Trade-offs between access options

When a truck can back up close and reach the forms with its chute, placing is simplest and puts the least extra traffic on the yard. Wheeling avoids driving a truck over lawn or near septic parts, but it takes more labour and more trips across the route, so the route still needs protecting. Pumping reaches far and over obstacles such as houses and fences, and it keeps heavy trucks off soft ground, but it adds equipment and cost to the job. Taking down a section of fence or trimming a branch can sometimes open a route that makes the rest of the job simpler.

How the decision usually goes

Most homeowners have not thought about access until it comes up. The usual order is to look at where the truck can safely park, how far that is from the forms, and what lies between. From there, the choice between the chute, wheeling and pumping tends to follow. Anything that has to be protected, moved or marked is agreed before the pour, so pour day is not the first time anyone looks at the route.

Our guide to Planning a Concrete Project in the Puget Sound covers access along with wet ground and marking lines.

Common questions

Will the truck damage my lawn?

A loaded truck can leave ruts in soft lawn, especially in wet weather. Choosing a route over firm ground, or wheeling or pumping instead, reduces the risk.

Can the truck drive on my existing driveway?

Often it can, but thin or already cracked paving may not hold a loaded truck well. It is worth pointing out any weak spots before the pour.

What should I move before pour day?

Cars, trailers, bins, planters and anything else along the route. Gates should be open and pets kept inside.

Ready to talk about your project? Request a free estimate.

New broom-finish driveway in front of a three-car garage

Get your free estimate

  1. 1You send the form.
  2. 2We get in touch.
  3. 3We come and look at the job.
  4. 4You get it in writing.
  5. 5You decide.

Hours

  • Monday–Friday, 7 a.m.–7 p.m.
  • Saturday, 7 a.m.–3 p.m.
  • Closed Sunday

Based in

Orting, WA

Request Your Free Estimate

No pressure, and no obligation. We come and look at the job before we give you a number.

Call (253) 271-4640Free Estimate