Why Two Concrete Quotes for the Same Job Come Back Different
It is common to get two concrete quotes for what you think is the same job and find them far apart. Usually the jobs are not the same, they are just described the same way.
Thickness
A thinner slab uses less concrete. A thicker one carries more. If the thickness is not written down, you do not know what you are comparing.
Reinforcement
Steel or no steel, and how much, changes the price and how the slab holds together once it cracks.
Base preparation
This is the biggest hidden difference. Digging out soft ground and compacting a proper base takes time and material.
Removal
Is breaking out and hauling off the old concrete included?
Finish
Broom, stamped or topcast are different amounts of work.
How to compare
Ask each estimate to describe the same things: area, thickness, reinforcement, base, finish, drainage and removal. The written scope post and the cost guide cover it further.
What to look at on your own site
Some of the difference between quotes comes from the site itself, and each person quoting may read it differently. Walk the area and note what is there now: old concrete, lawn, gravel or bare soil. Look at how water moves after rain and whether the ground stays soft. In Pierce and King County, wet ground is common, and one quote may allow for digging out soft soil while another assumes the ground is fine. Look at access too, such as gates, slopes and the distance from the street, since one quote may assume the truck can reach the forms and another may include wheeling or pumping.
Plain explanations of the terms
Thickness is how deep the slab is. Reinforcement is the steel placed in it, such as rebar or wire mesh. Base preparation covers digging out soft ground, placing crushed rock and compacting it in layers. Removal is breaking out the old slab; haul-off is taking it away. Finish is the surface texture chosen at the time of the pour. Drainage is the slope of the slab and any work to send water away from it. An allowance is a placeholder amount for something not yet decided.
Lining two quotes up
Put the quotes side by side and list each item down the page: area, thickness, reinforcement, base depth and compaction, slope, finish, joints, removal and haul-off, and access. Mark what each quote says about each item. Where one is silent, it is fair to ask. Once each line is filled in, the reason for the gap usually shows. Often the higher quote includes base work or removal the lower one does not, or names a thicker slab or more steel.
Trade-offs to weigh
A lower quote that leaves out base preparation may save money at the start and cost more if the slab settles. A thinner slab saves concrete but carries less load, which matters more on a drive than on a walk. A broom finish costs less than stamped or topcast, and that can be a fair saving if looks matter less in that spot. The point of comparing is to see which differences are choices you are happy to make and which are corners you would rather not cut.
How the decision usually goes
Most homeowners start by looking at the totals and end up comparing the descriptions. Once each quote is filled in item by item, the choice usually comes down to which one describes the job you want, clearly, for a price that makes sense for that work.
Our guide to How Much Concrete Work Costs explains each item that moves a price.
Common questions
Should I just pick the lowest quote?
Only once you know it includes the same work as the others. Differences in base, thickness, steel and removal often explain a lower number.
What if a quote does not mention the base?
Ask what base material, depth and compaction are planned, and ask for the answer in writing.
Why would two quotes measure a different area?
Each may have measured a slightly different outline or included an apron, landing or edge the other left out. Checking the measurements is worth doing.
Ready to talk about your project? Request a free estimate.

Get your free estimate
- 1You send the form.
- 2We get in touch.
- 3We come and look at the job.
- 4You get it in writing.
- 5You decide.
Call
(253) 271-4640Hours
- Monday–Friday, 7 a.m.–7 p.m.
- Saturday, 7 a.m.–3 p.m.
- Closed Sunday
Based in
Orting, WA
Request Your Free Estimate
No pressure, and no obligation. We come and look at the job before we give you a number.